Experience Summary

  1. Levee repair, Non-Federal Levee Rehabilitation of Flood Control Works Labadie Bottoms Corp Sec 4, Labadie Bottoms Levee District Sec 5 & 6 in Franklin County Missouri., Contract № W912DQ-18-C-1055
    • Franklin County, MO- The project consists of ±25,000 CY fill placement for a breach repair on a non-federal levee embankment and all necessary work associated with a riverside foreshore foundation failure.
    • Date: July, 2018
    • Duration: 180 days.
    • Point of contact: CONTRACT SPECIALIST: Laura L. Hedrick PHONE: 816-389-3023 E-MAIL: l.hedrick@usace.army.mil, PROJECT MANAGER: Kent N. Myers PHONE: 816-389-3399 E-MAIL: kent.n.myers@usace.army.mil
    • 100% of work self-performed.
  1. WRP ACEP Restoration Program project contract no 124D9018C0006. Obstruction removal and fence construction on easement properties in Refugio County, Texas.
    • Removal of 37,000 ft of obstruction and installation of 34,000 ft of barbed wire fence, all steel posts and gates.
    • Date: April 2018
    • Duration: 120 days.
    • Point of contact: Will Blackwell, District Conservationist, Refugio, Texas 361/526-2531 Ext. 3
    • 100% of work self-performed.
  1. ACEP-WRE Restoration – Long beard SC (Contract No AG-2B46-C-17-0033) for US Dept of Agriculture, Richland County South Carolina
    • Repair of erosion damage, restoring and graveling roads, creation of drainage and erosion control structures.
    • Date: Aug 2017
    • Duration 33 days
    • Point of Contact: ORIEL VELEZ 787-766-6502
    • 100% of the work is self-performed (no subcontractors)
  1. ACEP-WRE Restoration Micro/Macro Construction – Neary Ventures (Contract No AG-4D90-P-17-0272) for US Dept of Agriculture, Matagorda County TX
    • Creation of two shallow ponds.
    • Date: Aug 2017
    • Duration 33 days
    • Point of Contact: Ryan Nelson, P.E. James Smith PE, 936 332 2790
    • 100% of the work is self-performed (no subcontractors)
  1. AG-1A23-C-17-0011 SERVICES: WRP Restoration Construction Project, for US Dept of Agriculture, Presque Isle, East Lansing, MI
    • Demolition and reconstruction of earthen wall and water control structures.
    • Date: Sept 15, 2017
    • Duration 40 days
    • Point of Contact: Alan Leta, (860) 871-4031, alan.leta@wdc.usda.gov
    • 100% of the work is self-performed (no subcontractors)
  1. USDA Wetlands Reserve Program (ACEP) Restoration Micro/Macro Construction Matagorda County, Texas. (Contract Number: AG-4D90-P-17-0198)
    • Obstruction removal, and demolition of unwanted structures within the easement area.
    • Date: July 23, 2017
    • Duration: 22 days
    • Point of Contact: James C. Smith, P.E. ph 361-550-7172 Govt. Mobile
    • 80% of the work is self-performed
  1. Waterline replacement (Contract No W91237-17-P-0600) for US army Eng. Corps, Bainsbridge, OH
    • Replace and install 1500’- 3” dia. Sch 80 PVC water line.
    • Date: July 2017
    • Duration 45 days
    • Point of Contact: Todd Milne ph (937) 365-1470
    • 100% of the work is self-performed (no subcontractors)
  1. Waterline replacement (Contract No W912QR-17-P-0068) for US army Eng. Corps, Campbellsville, KY
    • Replace and install 2600’ 2 in dia. HDPE water line.
    • Date: May- June 2017
    • Duration 10 days
    • Point of Contact: Dave Wethington; ph 859 533 6629
    • 100% of the work is self-performed (no subcontractors)
  1. Site clean-up in Rio Grande City, TX, US Army Corps of Engineers, (Contract No. W912QR-17-T-0002.
    • A construction site clean-up for US Army. (This project included:10 acre of grading, leveling and drainage, removal of debris and structures, storm water control and permits.
    • Duration: 60 days
    • Dated completed Jan 20, 2017
    • Point of Contact: Pablo Hernandez, P.E. Mobile: 956-522-0405
    • 100% of the work is self-performed (no subcontractors)