Work Record

US Government Projects Summary

Circle V Harvesting Co, Sneedville TN 37869, Duns 072012194

  1. WRE wetland restoration USDA, NRCS, Contract No.122B4618P0130
    • Hydrology restoration, Berkeley County, WV. Construct a levee by clearing, grubbing, moving and compacting 12,000 CY, installing, a riser and outflow pipe with drainage diaphragm, an 8” PVC drain pipe, Plunge pool lined with riprap, and revegetating all disturbed areas.
    • Date: June, 2019.
    • Duration: 60 days.
    • Point of contact: CONTRACT SPECIALIST: Danny Mandell, ph 254 742 9923, email Danny.Mandell@wdc.usda.gov

  2. WRE wetland restoration USDA, NRCS, Contract No.122B4618P0130,
    • Hydrology restoration, McCracken County, KY. Construct shallow ponds by clearing, excavation, earth fill, placing riprap, seeding & mulching.
    • Date: May, 2019
    • Duration: 8 days.
    • Point of contact: CONTRACT SPECIALIST: Nancy Harris, ph 615 277 2543, Nancy.harris@wdc.usda.gov.

  3. Road repair, ERFO National Wildlife Reserve. Contract No.140F0418P0400
    • FWS Eufaula NWR, Eufaula AL. Rehabilitate roads, clear away flood debris, strip existing gravel, restore subgrade by shaping compacting, and smoothing, place filter cloth, gravel and compact. Place riprap, replace culverts and restore road shoulder.
    • Date: Mar, 2019
    • Duration: 30 days.
    • Point of contact: CONTRACT SPECIALIST: Monica Faulk, ph 404 679 4065, monica_faulk@fws.gov

  4. Road repair, ERFO, FSR 505-M ROAD CONSTRUCTION, Long Cane Ranger District Edgefield, SC. Contract No.124670-18-C-00056
    • Marion Sumter National Columbia SC, Dewatering, Clearing & grubbing, removal & replacement of arch pipe, machine placed riprap, placed streambed simulation rock and revegetation.
    • Date: Dec 2018
    • Duration: 30 days.
    • Point of contact: CONTRACT SPECIALIST: Mark J Miller, (803) 561-4020 markjmiller@fs.fed.us

  5. Road repair, ERFO, FSR 634/656/659B ROAD CONSTRUCTION, Long Cane Ranger District Edgefield, SC. Contract No.124670-18-C-00058
    • Marion Sumter National Columbia SC, Road way regrade, reshape and resurface and replacing of culverts, linear grading, machine placed riprap, ditch cleaning, and revegetation.
    • Date: Dec 2018
    • Duration: 60 days.
    • Point of contact: CONTRACT SPECIALIST: Mark J Miller, (803) 561-4020 markjmiller@fs.fed.us

  6. Levee repair, Non-Federal Levee Rehabilitation of Flood Control Works Labadie Bottoms Corp Sec 4, Labadie Bottoms Levee District Sec 5 & 6 in Franklin County Missouri., Contract № W912DQ-18-C-1055
    • Franklin County, MO- The project consists of ±25,000 CY fill placement for a breach repair on a non-federal levee embankment and all necessary work associated with a riverside foreshore foundation failure.
    • Date: July, 2018
    • Duration: 180 days.
    • Point of contact: CONTRACT SPECIALIST: Laura L. Hedrick PHONE: 816-389-3023 E-MAIL: laura.l.hedrick@usace.army.mil, PROJECT MANAGER: Kent N. Myers PHONE: 816-389-3399 E-MAIL: kent.n.myers@usace.army.mil

  7. WRP ACEP Restoration Program for USDA NRCS, project contract no 124D9018C0006 obstruction removal, clearing of fence foot print, and fence construction on easement properties in Refugio County, Texas
    • Removal of 37,000 ft of obstruction (i.e. old fence, debris, brush, trees, other vegetation as required, trash, used fence posts and barbed wire) Rehabilitate access to new fence by clearing, installation of ±34,000 ft of new 4 strand barbed wire boundary fence, all steel posts and gates, welded H braces, steel T posts and steel intermediate posts.
    • Date: April 2018
    • Duration: 120 days.
    • Point of contact: Will Blackwell, District Conservationist, Refugio, Texas 361/526-2531 Ext. 3, William.Blackwell@tx.usda.gov
    • 100% of work self-performed.

  8. ACEP-WRE Restoration – Long beard SC (Contract No AG-2B46-C-17-0033) for US Dept of Agriculture, Richland County South Carolina
    • Repair and rehabilitation of erosion damage to public roads. The restoration and reshaping and improvement of drainage features. Install filter cloth and 4 in. of compacted gravel and crowned the road way surface. Installation of drainage and erosion control structures along the same roads. Revegetation and mulching of all disturbed areas.
    • Date: Aug 2017
    • Duration 33 days
    • Point of Contact: ORIEL VELEZ 787-766-6502, Oriel.Velez@wdc.usda.gov,
    • 100% of the work is self-performed (no subcontractors)

  9. ACEP-WRE Restoration Micro/Macro Construction – Neary Ventures (Contract No AG-4D90-P-17-0272) for US Dept of Agriculture, Matagorda County TX
    • Creation of two shallow ponds. Access Road was opened to gain access to construction area. Levees compacted, spoil piles were shaped, basin graded to specs. Total surface water area 18.9 acres and ±7,000 cubic yards of dirt were moved.
    • Date: Aug 2017
    • Duration 33 days
    • Point of Contact: Ryan Nelson, Ryan.Nelson@tx.usda.gov, P.E. James Smith PE, 936 332 2790
    • 100% of the work is self-performed (no subcontractors)

  10. WRP Restoration Construction Project, for US Dept of Agriculture, Presque Isle, East Lansing, MI. Contract no. AG-1A23-C-17-0011
    • Demolition and reconstruction of earthen wall and water control structures as well as access road to levee.
    • Date: Sept 15, 2017
    • Duration 40 days
    • Point of Contact: Alan Leta, (860) 871-4031, alan.leta@wdc.usda.gov
    • 100% of the work is self-performed (no subcontractors)

  11. WRE USDA Wetlands Reserve Program (ACEP) Restoration Micro/Macro Construction Matagorda County, Texas (Contract Number: AG-4D90-P-17-0198)
    • Obstruction removal, and demolition of unwanted structures within the easement area. Clearing and restoration of roadways. Demolition of unused buildings and debris removal, other structures. Decommissioning of a water well.
    • Date: July 23, 2017
    • Duration: 22 days
    • Point of Contact: James C. Smith, P.E. ph 361-550-7172 Govt. – NRCS, Hallettsville, TX James.Smith@tx.usda.gov
    • 80% of the work is self-performed

  12. Waterline replacement (Contract No W91237-17-P-0600) for US army Eng. Corps, Bainsbridge, OH
    • Replace and install 1500’- 2” dia. Sch 80 HDPE water line.
    • Date: July 2017
    • Duration 45 days
    • Point of Contact: Todd Milne ph (937) 365-1470
    • 100% of the work is self-performed (no subcontractors)

  13. Waterline replacement (Contract No W912QR-17-P-0068) for US army Eng. Corps, Campbellsville KY
    • Replace and install 2600’ 3 in dia. PVC water line, Install new line alongside a public road, install at depth >40” provided a sand pipe bed for new pipe line, installed main valves as well as, loop line valves, with valve boxes, connect to the existing building supply lines, disinfect the new installation, pressure test, revegetate and mulch all disturbed areas.
    • Date: May- June 2017
    • Duration 10 days
    • Point of Contact: Dave Wethington; ph 859 533 6629
    • 100% of the work is self-performed (no subcontractors)

  14. Site regrading & clean-up in Rio Grande City, TX, US Army Corps of Engineers, (Contract No. W912QR-17-T-0002
    • A construction site clean-up for US Army. (This project included 10- acres of regrading, leveling and drainage, removal of debris and structures, storm water control and permits.
    • Duration: 60 days
    • Dated completed Jan 20, 2017
    • Point of Contact: Pablo Hernandez, P.E. Mobile: 956-522-0405, CIV USARMY CESWG (US) Pablo.Hernandez@usace.army.mil,
    • 100% of the work is self-performed (no subcontractors